EMERGENCY_AND_EXIT_LIGHTS_2ND_PAGE_VER_02_banner

  • Emergency and Exit Light Testing
    • Monthly Procedures:
  • Adequate electrical supply
  • Discharge test
  • Visual inspection
  • Replacement of non-complaint fittings
  • Replacing expired tubes and lamps
  • A log or record of fitting details,test procedures and results

EMERGENCY_AND_EXIT_LIGHTS_2ND_PAGE_VER_02_monthlyProcedure

  • Six-Monthly Procedures:
  • Visual Check
  • Check for operation of maintained lights
  • Operate test switch or circuit breaker to simulate a power failure
  • Restore lights
  • Check operation of all maintained lights
  • Report any failures
  • Replace lights where necessary

EMERGENCY_AND_EXIT_LIGHTS_2ND_PAGE_VER_02_sixMonthlyProcedure

  • Twelve-Monthly Procedures:
  • As per the six-monthly procedure
  • Clean all lighting diffusers

EMERGENCY_AND_EXIT_LIGHTS_2ND_PAGE_VER_02_twelveMonthlyProcedure

<< Back